Manufacturing Excellence · Dubai, UAE

Manufacturing
Process Guide.

A complete step-by-step visual walkthrough of our pod device manufacturing process — from raw components to finished, quality-certified product. Every unit follows this exact precision workflow.

Total Steps27 Steps
Production435 Pcs / Hr
QC StandardESMA Certified
Pass Rate99.8%
I

Coil & Heating Element Assembly

The foundation of every pod — precision coil winding, cotton-wick assembly, and silicone base preparation. These components directly determine vapor quality and consistency.

Step 01 01
Phase I · Step 01

Heating Wire Threading

The heating wire (with precision-ground pin) is manually threaded through the silicone assembly with 3 sealed holes. Alignment must be perfect to ensure full electrical contact and prevent short circuits.

  • Heating Wire (with Pin)
  • Silicone Assembly (3 holes)
  • Manual hand threading
Manual Assembly
Step 02 02
Phase I · Step 02

Oil Storage Cotton Assembly

Two precision-graded oil storage cotton pieces are threaded onto the heating wire — upper and lower — maximising e-liquid absorption and ensuring consistent flavour delivery.

  • Heating Wire
  • Oil Storage Cotton (×2)
  • Silicone Base
2-Layer Cotton
Step 03 03
Phase I · Step 03

Steel Pipe & Silicone Base

The food-grade steel pipe is fitted with a silicone tube at the top and mounted onto the silicone base — forming the structural backbone and airflow channel for the coil assembly.

  • Steel Pipe (food-grade stainless)
  • Silicone Tube (top seal)
  • Silicone Base (bottom mount)
Food-Grade Steel
Step 04 04
Phase I · Step 04

Heating Wire Assembly Complete

The completed heating wire assembly — cotton and silicone base — is ready for oil cup insertion. Final visual QC confirms cotton placement and wire alignment.

  • Completed Heating Wire Assembly
  • Silicone Base (sealed)
  • Visual QC inspection
QC Checkpoint
II

Oil Cup Build & Atomizer Assembly

The oil cup houses the e-liquid reservoir, coil assembly, and airflow system. Each component assembled in strict sequence to ensure zero-leak performance.

Step 05 05
Phase II · Step 05

Cotton-Wrapping & Oil Cup Prep

Cotton-wrapping sticks are prepared and the transparent oil cup reservoir is inspected for cracks or mould defects before assembly begins.

  • Cotton-Wrapping Stick
  • Oil Cup (transparent reservoir)
  • Pre-assembly visual inspection
Visual Inspection
Step 06 06
Phase II · Step 06

Steel Pipe Insertion into Oil Cup

The steel pipe assembly is inserted into the oil cup. The pipe provides the central airflow channel while the surrounding space forms the e-liquid chamber.

  • Steel Pipe Assembly
  • Oil Cup (transparent)
  • Silicone Base (bottom seal)
Precision Fit
Step 07 07
Phase II · Step 07

Silicone Oil Cup Support Ring

The silicone oil cup and support ring are assembled. This double-layer silicone system creates a watertight base seal preventing any e-liquid leakage.

  • Silicone Oil Cup
  • Silicone Oil Cup Support Ring
  • Double seal verification
Zero-Leak Seal
Step 08 08
Phase II · Step 08

Air Adjustment Component

The air adjustment component is fitted with the silicone rubber gasket — controlling airflow resistance and defining the draw tightness and overall vaping experience.

  • Air Adjustment Component
  • Electrode Plate
  • Isolation Cotton (insulator)
  • Silicone Rubber Gasket
Airflow Control
Step 09 09
Phase II · Step 09

Electrode Plate & Lower Cover

The electrode plate assembly — with isolation cotton — is installed into the lower cover. Lead wires (black and blue) are routed through silicone sealing holes.

  • Electrode Plate Assembly
  • Isolation Cotton
  • Lower Cover Housing
  • Lead Wire (Black + Blue)
Electrical Assembly
Step 10 10
Phase II · Step 10

Microphone Head Connector

The connector — with precision gold bent pin lines and sealing silicone — is assembled with lead wires. Creates the contact interface between the pod and main device body.

  • Bent Pin Lines (gold-plated)
  • Microphone Head Sealing Silicone
  • Lead Wire (Black + Blue)
Gold-Plated Pins
III

Oil Filling & Air Pressure Testing

Automated precision filling followed by 100% air pressure testing — every pod individually verified before proceeding.

Step 11 11
Phase III · Step 11

Automated Oil Filling Station

Pods load onto a rotary turntable. The filling nozzle assembly — with 4 precision oil inlet tubes — simultaneously fills 4 pods per cycle with exact measured volumes to ±0.05ml accuracy.

  • Oil Inlet Tubes (×4)
  • Filling Nozzle Assembly
  • Rotary Turntable Platform
  • Automated weight verification
Automated Filling
Step 12 12
Phase III · Step 12

Air Pressure Integrity Test

Every filled pod undergoes a mandatory air pressure test using a calibrated air gun and air supply unit. Any pod failing the pressure test is immediately rejected from the production line.

  • Air Gun (calibrated)
  • Steel Pipe Test Fixture
  • Air Supply Unit
  • 100% individual unit testing
100% Test Coverage
IV

Pod Body & Airflow Assembly

Assembling the complete pod cartridge — oil cup pressed into lower cover, airflow intake installed, pod sealed for device integration.

Step 13 13
Phase IV · Step 13

Press Machine — Lower Cover Seal

The oil cup assembly is mechanically pressed into the lower cover using an industrial press machine with calibrated press head. Creates a permanent, leak-proof mechanical seal — no adhesives required.

  • Lower Cover
  • Oil Cup Assembly (filled)
  • Press Machine + Press Head
Industrial Press
Step 14 14
Phase IV · Step 14

Airflow Intake Adjustment System

The 4-position air intake push button system is installed — letting users customise draw resistance. Each position is verified to deliver the specified airflow resistance rating.

  • Air Intake Hole Support
  • Air Intake Push Button
  • Silicone Buckle (4th position)
  • 4-position function check
Adjustable Airflow
Step 15 15
Phase IV · Step 15

Pod Outer Body — Complete

The completed pod assembly is fitted into the kraft outer shell with silicone lining. The transparent oil cup window allows liquid level visibility. Pod is now ready for integration with the main device body.

  • Kraft Outer Housing
  • Silicone (inner lining)
  • Oil Cup (completed)
  • Final pod seal verification
Pod Complete
V

Electronics & Battery Assembly

Solution board, battery, button, and charging circuit assembled into the device housing with precise wire routing and thermal management.

Step 16 16
Phase V · Step 16

Battery & Solution Board Assembly

The lithium-polymer battery (3.7V, 300mAh) is connected to the solution board via positive (red) and negative (black) wires. EVA cotton thermal padding placed between battery and PCB prevents heat transfer.

  • Battery (3.7V LiPo — 300mAh)
  • EVA Cotton (thermal padding)
  • Solution Board (PCB)
  • Positive Wire (Red) + Negative Wire (Black)
3.7V LiPo System
Step 17 17
Phase V · Step 17

Electronics into Device Housing

Battery, solution board, and button are installed into the support bracket within the device housing. All wires routed per specification and secured to prevent movement during operation.

  • Solution Board (with button)
  • Battery (wired)
  • Support Bracket + Device Housing
  • Charging Port connection
PCB Integration
VI

Soft Screen & Outer Housing

Device display, bracket assembly, and transparent outer housing assembled in a precise 7-step process — completing the main body.

Step 18 18
Phase VI · Step 18 — 7-Stage Process

Soft Screen Installation (7 Steps)

The flexible OLED display is installed in 7 documented stages: bracket placement → cable connector alignment → flexible cable routing → screen positioning → bracket securing → clip engagement → final verification. The cable connector must engage perfectly for full display function.

  • Device Body with Bracket
  • Soft Screen (flexible OLED)
  • Flexible Cable + Cable Connector
  • 7-stage assembly verification
Flexible OLED Screen
Step 19 19
Phase VI · Step 19

Pod + Main Body Integration

The completed oil cup assembly (pod) is joined with the bracket assembly (electronics). The lead wire (red) connects to the bracket charging circuit. Charging port alignment verified before final clip-lock.

  • Oil Cup Assembly (complete pod)
  • Bracket Assembly (electronics)
  • Lead Wire (Red)
  • Charging Port alignment check
Pod + Body Join
Step 20 20
Phase VI · Step 20

Transparent Outer Housing & Clips

The transparent outer housing is fitted over the complete internal assembly. Four precision clip-lock points engage with the bracket. Button and charging port cutout alignment verified before final clip engagement.

  • Outer Housing (transparent PC)
  • Clips (×4 — press-lock)
  • Button alignment verification
  • Charging Port cutout check
4-Point Clip Lock
VII

Final QC Inspection & Cleaning

Every finished unit undergoes function testing, puff testing, and final visual quality inspection before cleaning and packaging.

Step 27 27
Phase VII · Final Step

Final Cleaning & Quality Inspection

White-gloved technicians perform final visual inspection and cleaning. The finished device is wiped with a lint-free cloth to remove fingerprints and residue. Only units passing all function and visual checks proceed to packaging.

  • White cotton gloves (anti-static)
  • Lint-free cleaning cloth
  • Full device function test
  • Puff count verification
  • Final visual defect inspection
ESMA Certified Pass
27
Assembly Steps
100%
Unit Testing
99.8%
QC Pass Rate
ESMA
Certified
Manufacturing Excellence

Want This Process
For Your Brand?

This exact 27-step manufacturing process — applied to your private label product. Our Dubai facility is ready to build your brand.

Start Your OEM Project View OEM Services
WhatsApp Us
Get Quote